Skip to content
Gate hours Sun–Fri 06:00–19:002nd Industrial City, Dammam+966 56 978 9151info@canasa.coContactالعربية
  1. Home
  2. Projects

Strip-outs, decom­missioning and demolition recovery

Site clearances where the metal we recover pays part of your bill. Scoped on site, priced as one written package and documented to the tonne.

Welding sparks during an industrial strip-out

How a project runs

One package, priced before the first truck rolls.

  1. 1
    Walk the site

    Our estimator walks the site with you and notes access, hours and permits.

  2. 2
    One written package

    Scope, schedule, price and the recovery credit that reduces it.

  3. 3
    Cut, clear and load out

    Every outbound truck is weighed and photographed.

  4. 4
    Close-out

    Bill of materials, weigh tickets and the final settlement.

How the number works

The metal in a structure pays for part of its own removal, and the credit is shown on the quote.

  • Project costCutting, clearing, haulage
  • Recovered valueMetal weighed and credited
  • Your billCost less the recovered value

Illustrative proportions; every project is priced on its own.

  • Decommissioning
    DecommissioningPlant areas, lines, chillers and tanks cut down and weighed out.
  • Demolition recovery
    Demolition recoverySteel separated on site and lifted into roll-offs.

Illustrations of typical work.

What we take on

Workshops, warehouses, plant areas and full structures across Dammam, Khobar, Dhahran, Jubail, Abqaiq and Al Hofuf.

An empty industrial hall

Strip-outs and clearances

Workshops and warehousesScope a strip-out
An industrial plant at sunrise

Decommissioning

Plant areasScope a decommissioning job
A grab lifting demolition scrap under a gantry

Demolition recovery

Full structuresScope a demolition
A mixed pile of scrap in a yard

Site clearance

Yards and sitesScope a clearance

What you are promised, and what you hold at the end

Each promise comes with a document you keep.

Scope in writing

An estimator walks the site and returns one page: scope, schedule, fixed price and the recovery credit that reduces it.

You get the written package
Recovered value credited

Every outbound truck is weighed on a certified scale and photographed on its way to our yard, and the value comes off your bill.

You get a ticket per truck
Delivered to the date named

Schedules signed around your shutdown window, permits and PPE on every site, and a bill of materials matched to the tickets at the end.

You get the close-out statement

Questions project managers ask

Three things to settle at the first site walk.

How is the recovered value worked out?

By weight on a certified scale and by grade, the same way the yard prices any load. The credit is written into the quote.

Who handles permits and safety?

canasa handles site permits and the safety plan; your site’s own rules apply on top. PPE is in place on every site, toolbox talks are held before work starts, and the schedule is signed around your shutdown window.

Where do you work?

Dammam, Khobar, Dhahran, Jubail, Abqaiq and Al Hofuf.

Bring us the building

Workshops, warehouses, plant areas, full structures. If it holds metal, the project can pay for part of itself.

GateSun–Fri 06:00–19:00
Find us2nd Industrial City, Dammam 34332
Call the yard+966 56 978 9151 · Sun–Fri 06:00–19:00
The weight you watchCertified scale, photographed
Prices that holdAgreed in writing, first
Money that arrives
Spoken your wayEnglish · العربية · اردو · বাংলা · हिन्दी · Tagalog · മലയാളം